From: route@monster.com
Sent: Tuesday, December 01, 2015 2:35 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Primavera P6
This resume has been forwarded to
you at the request of Monster User xapeix01
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Fernando Guerrero-Acevedo 2318 Broadway St. Indianapolis, IN 46260 Email: fguerrero4020@yahoo.com Cell 317 690 9901 Summary: ·
Strong
experience in working as a leader developing, controlling and implementing
information systems, using Primavera Project Planner and MS-Project, to plan,
program, and control new projects in heavy industrial companies in Colombia,
South America. ·
Well versed
in coordinating scheduling input from multiple contractors and incorporate
the information gathered into the integrated schedule. ·
Meticulous in
using Structured Query Language SQL in Access Database, ORACLE Database and
DB2 Database. ·
Hands on
experience in monitoring and forecasting progress of activities in schedules
by assessing or measuring physical progress in engineering and field
construction. Highlight problem areas and recommend remedial actions. ·
Experience in
acting as a liaisons with all team leaders to communicate required completion
dates and interfaces between responsible parties. ·
Experience
with organizing and co-facilitating sessions dealing with Project Management
tools, such as: Project Plan, Work Breakdown Structure, estimating hours,
Network Diagram, Schedule Development, Facilitating Processes – Change
Control Management, Communication Management Plan, and Risk Management Plan,
Re-planning efforts, others as agreed with Project Manager. ·
Experience
with Next Gen Enterprise Resource Planning (ERP) project participation. Skills ·
Primavera
Professional P5, P6 R8.3 ·
Primavera
Project Planner, Timesheets, My-Primavera ·
MS Project
2007, 2010 ·
MS Access,
Excel ·
Structured
Query Language SQL ·
Budget ·
Document
Control Education: ·
Bachelors
Degree in Computer Engineer, Universidad Nacional de Colombia, Bogotá,
Colombia, South America. ·
Project
Management Primavera P6 Update - HEARTLAND Community College, Bloomington, IL Experience: Progress Rail
Manufacturing Corporation, Muncie IN Jan 14 – Jul 14 Project Scheduler
Engineer ·
Using
Primavera P6 and MS Project 2010, preparing and maintaining the overall
integrated, resource loaded project schedule to ensure optimization of
resources and control of all associated project work. ·
Integrate
project work scope into detailed, resource loaded turnaround schedules. Projects
participation: NFSE Development 710GAS HPDI: High
Pressure Direct Injection 710GAS DGBI:
Dynamic Gas Blending Tier 4 Locomotive
Development CAF USA, Elmira NY Jan
13 – Dec 2013 Project
Planner/Scheduler Engineer Using MS-Project
and Primavera Professional P6 R8.1 in an EPC project for the construction of
4 cars prototypes for AMTRAK, developed
the following functions: ·
Participates
in developing Work Breakdown Structure. ·
Used
Structured Query Language SQL in Access Database, ORACLE Database and DB2
Database. ·
Coordinates
schedule input from multiple contractors and incorporate the information
gathered into the integrated schedule. ·
Prepares
short-term look ahead schedules and leads the update in routine progress
meetings. ·
Responsible
for developing, measurement and reporting progress, including progress
"S" curves. ·
Monitors and
forecasts progress of activities in schedules by assessing or measuring
physical progress in engineering and field construction. ·
Highlight
problem areas and recommend remedial actions. ·
Evaluates
allocation of resources and provide recommendations to maintain required
progress. ·
Forecasts
monthly expenditures and work progress for the project ·
Liaisons with
all team leaders to communicate required completion dates and interfaces
between responsible parties. Cummins Engine,
Columbus, IN 2011 – 2012 Project
Planner/Scheduler Engineer ·
Next Gen
Enterprise Resource Planning (ERP) project participation. ·
This project
transformed the Distribution Business Unit (DBU) into global distribution
operations. ·
The project
improved the collaboration in the distribution channel with global
information accessibility and sharing, implementation of common business, and
improved integration with suppliers and customers, using Oracle/Siebel
applications. ·
The purpose
of my job like Project Planner/Scheduler Engineer, using MS Project 2007 and
2010, was to position the project for success from the start with leadership
and management skills including the following task: ·
Settings
Directions, establishing project goals that stakeholders and team members
could understand work to achieve ·
Sharing
Vision, providing a framework and sufficient detail so that each member of
the team knows what to do and when to do it, and ·
Establishing
Rules, establishing methods for work to be accomplished, communication to
occur, and methods to track status and managed the changes that will
inevitably come the project way. SPG Indianapolis
INC. 2010 – 2011 Project Coordinator
- Production Supervisor ·
Responsible
for developing the master production plan to satisfy customer demand while
carrying minimum effective inventory. ·
Responsible
for providing the plant with a daily, weekly and monthly production plan
according with the plant capacity, using Material Requirement Planning MRP
and SAP’s Inventory Management System. ·
Planning,
coordinating, and consulting with the Project Manager and core team, the
priorities, task assignments, and work schedules of the resources assigned to
the project, using MS Project. ·
Participating
with other staff members the preparation of resources & cost planning,
budgets, estimates, and work plans for the efficient deployment of the
project team members using Earned Value Analysis. ·
Used
Structured Query Language SQL in Access Database, ORACLE Database and DB2
Database. ·
Planned,
analyzed, and develop all production process and activities including:
production line design, selection and training of operators, and material
flow monitoring and requisitioning. ·
Gathering
records and preparation of periodical project progress reports. Ongoing
planning, coordinating, training, and supervising the project staff work. State Farm
Insurance, Bloomington IL Jun 08 – Jul 09 Project Planner
Engineer ·
Define the
vision, goals and objectives needed to support projects and components and to
analyze the progress reported against work schedules. ·
Advocate,
advice, and/or educate project teams on the Project Management Processes
(planning, controlling, executing and closing). ·
This includes
the process’: purpose, use, deliverables, examples, and relationship to
Project Methodology. ·
Organize and
co-facilitate sessions dealing with Project Management tools, such as:
Project Plan, Work Breakdown Structure, estimating hours, Network Diagram,
Schedule Development, Facilitating Processes – Change Control Management,
Communication Management Plan, and Risk Management Plan, Re-planning efforts,
others as agreed with Project Manager. ·
Develop a
project schedule, focusing on the areas of: measuring work progress, managing
resource assignments, tracking milestones, monitoring metrics such as Earned
Value, burn rate, etc. ·
Used
Structured Query Language SQL in Access Database, ORACLE Database and DB2
Database. ·
Support
delivering the project on-time and within budget while meeting the goals by:
defining procedures for the collection of team status and analysis of project's
progress, including any metrics reporting and resource forecasting, updating
the project's schedule with periodic status updates collected from the
project team. ·
Analyzed the
updated schedule, emphasizing items such as a Critical Path, Slipped Tasks,
and Upcoming Tasks, calculating, analyzing and presenting metric reports,
such as Earned Value Analysis and Burn Rate Analysis, to appropriate parties.
·
Manage
resource assignments including submitting requests, monitoring current
allocations and forecasting future needs, meeting with Project Manager to
discuss project status. ·
Attend
project meetings, leading portions dealing with the schedule, metrics and
resources. Alpine Electronics
of America Jun 00 – May 08 Management Program
Engineer ·
I was responsible
for gathering the documentation required by the customer during the process
of developing new projects, using the Advanced Product Quality Planning
(APQP) methodology. ·
I developed
an Information Systems to plan, program, manage, and control the progress of
new projects. ·
Additionally
responsible for identifying and bringing to the General Manager’s
attention all conditions that may indicate current or future schedule, cost
or technical problems. ·
Using
MS-Project, maintaining the Program Master WBS, ensuring that project plans
are submitted to the customer on time, overseeing preparation and review of
Periodic Progress Reports. Distral S.A.
Colombia, South America 1990 – 2000 Project Engineer In Distral S.A., I
had to incorporating Project Management to perform Project Management duties,
detailed engineering of main production plants, and purchase management of
major equipment required for said plants, supervision of technical and
administrative fulfillment of all contracts involving construction,
commissioning and implementation. Some Projects
participation like a scheduler using Primavera Project Management tools: Electrical Project,
1994-2000 TEBSA ·
This project
EPC, consisted of increasing the output of power from 250 Mega Watts to 750
Mega Watts for the local government power generation company in Barranquilla,
Colombia S.A. ·
Budget was
$700 Million dollar U.S., and was a Design, Supply, and Build, Joint Venture
with Asea Brown Boveri - ABB. ·
Used DB2 for
running AS400. Oil Projects - EPC ·
POLIDUCTO DE
ORIENTE, Empresa Colombiana de Petróleos – ECOPETROL, US $200 Million,
Joint Venture with British Petroleum – BP
1998 – 2000 ·
FOUR PUMP
STATIONS, Empresa Colombiana de Petróleos – ECOPETROL, US $120 Million, Joint
Venture with Fluor Daniel
1992 – 1996 ·
130 UNIT and
PARAFINES UNIT REBAMPING, Empresa Colombiana de Petróleos – ECOPETROL, US
$110 Million, Joint Venture with Parsons Corporation
1990 – 1990 Industrial
Production Projects - EPC ·
Cement
Production ·
Sugar
Production ·
Pulp and
Paper Production ·
Garbage
Process |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
Spanish |
Fluent |
|
|
|